Groupe VVS

CERTIFIED INSTALLER · OKA

Electric vehicle charger installation in Oka

Level 2, 240 V charging (7.2 kW) — turnkey installation in Oka by our CMEQ #17356 master electricians, eligible for the $600 Roulez vert rebate. Response time: 24 to 48 h.

★★★★★
4.9 / 5· 250+ Google reviews
Flo EV charger logo
Wallbox EV charger logo
Residential EV charger installation in Oka
Flo Home X5 Level 2 EV charger

Your EV charger installer in Oka

Groupe VVS installs and services heat pumps, air conditioning, heating and electrical systems in Oka — including Village, Le Calvaire. Certified RBQ, CMEQ and CMMTQ technicians, free written quotes and a typical response time of 24 to 48 h.

We proudly serve, among others: Village · Le Calvaire.

Why choose Groupe VVS for your EV charger

Level 2 · 7.2 kW

Full charge in 4 to 8 h at home in Oka (10× faster than a 120 V outlet).

Rated to -40 °C

Flo Home designed and assembled in Québec, NEMA 4X enclosure, ultra-flexible 25 ft cable.

CMEQ #17356

Installation by certified master electricians in Oka — permit and inspection included.

$600 Roulez vert

We fill out the rebate application for you. 0% financing available.

OUR PROCESS

From quote to first charge — 1 to 2 weeks.

01

Panel assessment

We check available capacity and the best location (indoor or outdoor).

02

Fixed quote in 24 h

All-inclusive price: charger, 40 A breaker, wiring, grounding, permit.

03

Clean installation

Neat cable routing, unit anchored to wall or pedestal, commissioning.

04

Training + rebate

App pairing, walkthrough demo and filing of the Roulez vert application.

ROULEZ VERT REBATE

Up to $600 back — we handle the application

  • Own an eligible new or used EV
  • Single-family or multi-unit residence in Oka
  • CSA-certified charger (Flo and Wallbox both are)
  • Installation by a CMEQ master electrician
Response: 24 to 48 h Installation 1-2 wks 3-year warranty

Local expertise · Oka

EV charger in Oka: what to know

Oka is part of the Southern Laurentians area, where you mostly find bungalows and split-levels from the 1970s to 1990s, with many new neighbourhoods of semi-detached and row homes. That shapes how we size and install every project.

In Oka, a Level 2 charger fully charges an electric car overnight. Since homes built before 1990 often have a 100 A panel that is maxed out as soon as a heat pump or EV charger is added, we always check panel capacity before installation.

We serve every sector of Oka, including Village, Le Calvaire (postal codes J0N), as well as Deux-Montagnes, Prévost, Saint-Colomban. Response time: 24 à 48 h.