CERTIFIED INSTALLER · OKA
Electric vehicle charger installation in Oka
Level 2, 240 V charging (7.2 kW) — turnkey installation in Oka by our CMEQ #17356 master electricians, eligible for the $600 Roulez vert rebate. Response time: 24 to 48 h.




Your EV charger installer in Oka
Groupe VVS installs and services heat pumps, air conditioning, heating and electrical systems in Oka — including Village, Le Calvaire. Certified RBQ, CMEQ and CMMTQ technicians, free written quotes and a typical response time of 24 to 48 h.
We proudly serve, among others: Village · Le Calvaire.
Why choose Groupe VVS for your EV charger
Level 2 · 7.2 kW
Full charge in 4 to 8 h at home in Oka (10× faster than a 120 V outlet).
Rated to -40 °C
Flo Home designed and assembled in Québec, NEMA 4X enclosure, ultra-flexible 25 ft cable.
CMEQ #17356
Installation by certified master electricians in Oka — permit and inspection included.
$600 Roulez vert
We fill out the rebate application for you. 0% financing available.
OUR PROCESS
From quote to first charge — 1 to 2 weeks.
01
Panel assessment
We check available capacity and the best location (indoor or outdoor).
02
Fixed quote in 24 h
All-inclusive price: charger, 40 A breaker, wiring, grounding, permit.
03
Clean installation
Neat cable routing, unit anchored to wall or pedestal, commissioning.
04
Training + rebate
App pairing, walkthrough demo and filing of the Roulez vert application.
ROULEZ VERT REBATE
Up to $600 back — we handle the application
- Own an eligible new or used EV
- Single-family or multi-unit residence in Oka
- CSA-certified charger (Flo and Wallbox both are)
- Installation by a CMEQ master electrician
Local expertise · Oka
EV charger in Oka: what to know
Oka is part of the Southern Laurentians area, where you mostly find bungalows and split-levels from the 1970s to 1990s, with many new neighbourhoods of semi-detached and row homes. That shapes how we size and install every project.
In Oka, a Level 2 charger fully charges an electric car overnight. Since homes built before 1990 often have a 100 A panel that is maxed out as soon as a heat pump or EV charger is added, we always check panel capacity before installation.
We serve every sector of Oka, including Village, Le Calvaire (postal codes J0N), as well as Deux-Montagnes, Prévost, Saint-Colomban. Response time: 24 à 48 h.
